<strike id="u8ask"></strike>
  • <ul id="u8ask"><center id="u8ask"></center></ul>
  • <samp id="u8ask"></samp>
    <strike id="u8ask"></strike>
    <samp id="u8ask"></samp>
  • 中文版 | English
     
    服務 Ignition
    服務 Wall wiper
    服務 Wood base
    服務 Winch rope
    服務 Kom rotator
    服務 Wheel packing
    服務 Drilling steel
    服務 Rotation pole
    服務 Conservation rubber
    服務 Liquid-gas separator
    服務 Hydraulic winch
    服務 Vacuum degasser
    服務 Blowout preventer
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/3/31 
      Wo Hing Petroleum ... 2011/3/31 
    Name: Langfang HeXing Petroeum Equipment
    Add: in the eastern ring road oil base village
    Tel: 15810047588
    Fax: 0317---2558811
    Mail: hx060718@yahoo.cn
    Product: staff@hexing.net.cn
    Location: Home >> Message details
      Wood base

       點擊圖片放大 

       詳細介紹
    Ⅰ Rig mat type
            
    Ⅱ Rig mat using
    Rig mat is mainly used for the equipment foundations of different drilling sites, such as derrick substructure, mud hog, purification can, engine house, tank car, jug, etc. It is convenient to install and has long performance life.
     
    Ⅲ Rig mat structure
    Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it. After the antiseptic treatment, the woods are clamped by M39 extended bolts.
    Ⅳ Main parameter list
     Rig mat parameter list
    Specification
    Length /mm
    Width /mm
    Thickness /mm
    Weight/Ib
    HGM8′×40′×6″
    12192
    2438.4
    160
    11973
    HGM8′×30′×6″
    9144
    2438.4
    160
    9043
    HGM8′×25′×6″
    7620
    2438.4
    160
    7604
    HGM8′×15′×6″
    4572
    2438.4
    160
    4273
     
    Ⅴ Method of application
    Rig mat can be used in any earth surface, especially in the weak formation. For the broad contact areas between rig mat and ground, it can be set on the ground directly if fulfilled the qualifications as below:
    Bearing pressure on foundation≥0.06Mpa
    Ground flatness≤40mm
     
    Ⅵ Rig mat advantages
        Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it after the antiseptic treatment. It is able to bear pressure and convenient to carry.
       
    Ⅶ Notice
    1、            Use only certified lifting devices when moving in case of accidents.
    2、  Clean the oil stains of surface every week.
    3、  Inspect the surface of rig mat, in case of odds and ends affect the stationarity of equipment.
    Add to Favorites| Home |Contact
    All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
    Tel:15810047588 Fax:0317---2558811
    Technical Support:Hao Lian Wang Luo
    主站蜘蛛池模板: 在厨房里被挺进在线观看| 手机永久无码国产av毛片| 亚洲熟妇色xxxxx欧美老妇| 一本大道AV伊人久久综合| 日韩久久精品一区二区三区| 午夜老司机免费视频| 97久久精品无码一区二区天美 | 四虎影视1515hh四虎免费| 黄色片网站在线免费观看| 女人让男人桶app免费大全| 亚洲av无码一区二区三区性色| 精品国产欧美一区二区| 国产亚洲欧美一区二区| 91精品国产色综合久久| 无码A级毛片日韩精品| 亚洲欧美在线观看首页| 琪琪see色原网中文| 国产卡一卡二卡三卡四| 97久久精品无码一区二区天美| 女大学生的沙龙| 一本久久伊人热热精品中文| 成人看片app| 久久综合丝袜日本网| 爱情岛永久免费| 免费在线h视频| 颤声娇是什么意思| 国产自产在线视频一区| 中文字幕日本最新乱码视频| 极品国产人妖chinesets| 公交车忘穿内裤被挺进小说白 | 国产高清在线免费视频| 久久久噜噜噜久久中文福利| 欧美牲交a欧美牲交aⅴ免费真| 人人揉人人捏人人添| 色偷偷噜噜噜亚洲男人| 国产偷窥熟女精品视频| 影音先锋成人资源| 好大好硬好爽免费视频| 一本色道久久88—综合亚洲精品| 成人毛片18女人毛片| 久久精品免费一区二区三区 |