<strike id="u8ask"></strike>
  • <ul id="u8ask"><center id="u8ask"></center></ul>
  • <samp id="u8ask"></samp>
    <strike id="u8ask"></strike>
    <samp id="u8ask"></samp>
  • 中文版 | English
     
    服務 Ignition
    服務 Wall wiper
    服務 Wood base
    服務 Winch rope
    服務 Kom rotator
    服務 Wheel packing
    服務 Drilling steel
    服務 Rotation pole
    服務 Conservation rubber
    服務 Liquid-gas separator
    服務 Hydraulic winch
    服務 Vacuum degasser
    服務 Blowout preventer
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/3/31 
      Wo Hing Petroleum ... 2011/3/31 
    Name: Langfang HeXing Petroeum Equipment
    Add: in the eastern ring road oil base village
    Tel: 15810047588
    Fax: 0317---2558811
    Mail: hx060718@yahoo.cn
    Product: staff@hexing.net.cn
    Location: Home >> Message details
      Wood base

       點擊圖片放大 

       詳細介紹
    Ⅰ Rig mat type
            
    Ⅱ Rig mat using
    Rig mat is mainly used for the equipment foundations of different drilling sites, such as derrick substructure, mud hog, purification can, engine house, tank car, jug, etc. It is convenient to install and has long performance life.
     
    Ⅲ Rig mat structure
    Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it. After the antiseptic treatment, the woods are clamped by M39 extended bolts.
    Ⅳ Main parameter list
     Rig mat parameter list
    Specification
    Length /mm
    Width /mm
    Thickness /mm
    Weight/Ib
    HGM8′×40′×6″
    12192
    2438.4
    160
    11973
    HGM8′×30′×6″
    9144
    2438.4
    160
    9043
    HGM8′×25′×6″
    7620
    2438.4
    160
    7604
    HGM8′×15′×6″
    4572
    2438.4
    160
    4273
     
    Ⅴ Method of application
    Rig mat can be used in any earth surface, especially in the weak formation. For the broad contact areas between rig mat and ground, it can be set on the ground directly if fulfilled the qualifications as below:
    Bearing pressure on foundation≥0.06Mpa
    Ground flatness≤40mm
     
    Ⅵ Rig mat advantages
        Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it after the antiseptic treatment. It is able to bear pressure and convenient to carry.
       
    Ⅶ Notice
    1、            Use only certified lifting devices when moving in case of accidents.
    2、  Clean the oil stains of surface every week.
    3、  Inspect the surface of rig mat, in case of odds and ends affect the stationarity of equipment.
    Add to Favorites| Home |Contact
    All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
    Tel:15810047588 Fax:0317---2558811
    Technical Support:Hao Lian Wang Luo
    主站蜘蛛池模板: 中文字幕第3页| 国产午夜精品1区2区3福利| 久久久亚洲欧洲日产国码农村| 男女一级免费视频| 中文无线乱码二三四区| 成人区人妻精品一区二区不卡网站| 午夜欧美精品久久久久久久| 青青草国产三级精品三级| 在线国产中文字幕| 久久久久久久久久久久久久久久久久 | 激情小说亚洲图片| 国产午夜福利片| 久久五月激情婷婷日韩| 天天躁日日躁狠狠躁| 久操免费在线观看| 玉蒲团之风雨山庄| 国产三级观看久久| 香蕉久久成人网| 国产美女一级视频| 两个体校校草被c出水| 日本人与物videos另类| 久久男人资源站| 欧美理论片在线观看一区二区| 免费中文字幕一级毛片| 青娱乐国产精品视频| 国产成人综合久久综合| 99久久国产热无码精品免费| 扒开女同学下面粉粉嫩嫩| 亚洲一区在线免费观看| 男人肌肌插女人肌肌| 免费毛片a线观看| 韩国三级电影网| 国产精品亚洲四区在线观看| √天堂中文官网8在线| 日本免费xxx| 久久天天躁狠狠躁夜夜不卡| 欧美人妖视频网站| 人善交VIDE欧美| 老子影院午夜伦不卡亚洲| 国产欧美日韩综合精品一区二区 | 奶特别大的三级日本电影|