<strike id="u8ask"></strike>
  • <ul id="u8ask"><center id="u8ask"></center></ul>
  • <samp id="u8ask"></samp>
    <strike id="u8ask"></strike>
    <samp id="u8ask"></samp>
  • 中文版 | English
     
    服務 Ignition
    服務 Wall wiper
    服務 Wood base
    服務 Winch rope
    服務 Kom rotator
    服務 Wheel packing
    服務 Drilling steel
    服務 Rotation pole
    服務 Conservation rubber
    服務 Liquid-gas separator
    服務 Hydraulic winch
    服務 Vacuum degasser
    服務 Blowout preventer
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/3/31 
      Wo Hing Petroleum ... 2011/3/31 
    Name: Langfang HeXing Petroeum Equipment
    Add: in the eastern ring road oil base village
    Tel: 15810047588
    Fax: 0317---2558811
    Mail: hx060718@yahoo.cn
    Product: staff@hexing.net.cn
    Location: Home >> Message details
      Winch rope

       點擊圖片放大 

       詳細介紹
    Ⅰ、The explanation of serial number
    Demonstration:
    H      Logo
    JC      Automotive Steel cable winch
    50      Apply to the rig of less than 5000 m,
    D       Automotive
    Ⅲ      
    Ⅱ、Voluntary standards
    Name:Automotive Steel cable winch
    Design code:Q/LHXS01-2008
    Ⅲ、Transmission schematic diagram
     
    Ⅴ、Operational principle
    HJC Steel cable winchis driven by machine, instead of the heavy operation of install and cut off drilling line with machine. This kind of machine is Cable Hoist produced by our Company. The fundamental principle of the equipment as transmission schematic diagram shows.
    (一)Ultimate composition
    1、Actuating system:Composed of power source(Electric machinery, hydraulic motor, compressed air motor and so on), reducing mechanism, chain drive, drum shaft, slip drilling line drum and cut off drilling line drum, clutch.
    2、Control system of electrical equipment:Composed of three-phase on-off control, relay, motor control line 3、Mount and pedestal:The foundation soldered of H type steel, and connected with drum bearing pedestal through bolt4、Gear shift organization:Composed of operating handle, gear shift lever, shifting fork and jaw.
    5、Brake equipment:Compose of brake disk, spring, rocker and foot plate.(二)Operational principle
        1、Set-up service:
    (1)Put the equipment to the side of drill floor steadily.  
    (2)Check whether to contain gear oil in the reduction gear or not.
    (3)Make 3×6mm2+4mm2 copper core cable line switch on380V three-phase supply, and connect null line and ground wire.
    (4)Use supporting bracket to carry drilling line,(or sling drilling line with hoist crotchet)then connect and fix the head of drilling line with wireline anchor on the bull wheel. Running roller, make bull wheel reeled with drilling line and order it.    (5)1 people should responsible for electric apparatus operation when operating, 1 people responsible for arraying drilling line, and 1 people responsible for look-out and direction.
        2、Operational principle:
    (1)When install drilling line, make messenger cross the drilling line composed of traveling block and crown block, and connected with the head of drilling line(Normally with welding method),at this time, with engagement of jaw clutches on cable belt conveyor rotated gear and messenger roller, make drilling line be in free route state. After inspecting well site operation area, start motor and make messenger roller rotate and twine messenger,so make drilling line into traveling system. After installing drilling line,fix the head of drilling line on drilling winch in time. And fix the drilling line on wireline anchor.
    (2)When take out drilling line,first confirm rig place without persons not concerned, make the jaw clutches to the gear of drilling line roller, then unclamp the drilling line fixed on drilling winch and unclamp the drilling line from wireline anchor,start motor,take out drilling line slowly and make drilling line withdraw to drilling line roller.

    Ⅵ、Fundamental parameter

         Type
        
    Number
    Parameter
    Models of products
    HJC50DⅢ
    HJC70D
    1
    Effective load:8000kg
    Effective load:12000kg
    2
    Power input of winch:15kw
    Power input of winch:15kw
    3
    Input rotational speed of  winch :1460r/min
    Input rotational speed of  winch :1460r/min:1460r/min
    4
    Maximum tension stress of winch:35000N
    Maximum tension stress of winch:40800N
    5
    Speed of output lines:0.25-1.0m/s
    Speed of output lines:0.25-1.0m/s
    6
    Turning diameter:1700mm
    Turning diameter:2100mm
    7
    Weight:3500kg
    Weight:3800kg
    8
    External dimension:2920×1900×1980
    External dimension2875×2450×2300
    9
    Voluntary standards:Q/LHXS01-2008
    Voluntary standards:Q/LHXS01-2008

    Ⅶ、The aDantage of HJC-70D210C Steel cable winch  
    1、This device can hold rope 2100m( 13/8″Φ38.1mm).
    2、This device has lightened the labor intensity of drilling crew’s workers by a large margin, improved working efficiency, shorten the time of moving nearly one day.
    3、Technology is ripe, dependability is good, ordered by a large margin , respond well at the scene, welcomed by the header of drilling crew, workers and well drilling company deeply.
    4、Driven by angular gear-trochospiral gear reducer, high driving efficiency, vertical output, hard packed, large torque, high accuracy gear, insure operating smoothly, low noise, prolong service life.
    5、 This kind of device is in the position of initiating in the territory of wearing the steel rope and shaking off the steel rope at home. There is no precedent both at home and abroad at present.
    Ⅷ、Attention must be paid to the following
    1.     Install ground cable when using electric apparatus.
    2.When take out of drilling line,,must bind fast line with coir rope by rule, and then fix after stripping fast line, after inspecting all of people leave the well field, can begin cutting off drilling line operation.
    3.When cutting off drilling line, 1 people should responsible for electric apparatus operation when operating, 1 people responsible for drilling line arrayed, and 1 people responsible for look-out and direction. At the same time coordinated with completing cutting off drilling line operation。
    4.When install drilling line, at the same time of repeating step 1,messenger in the doffer should be through traveling block and crown block systems, and then connect cable belt conveyor with messenger, operate according to step 3.
    5. Stop winch when shifting gear. In the process of transiting, claw and swift should be transported hang and shut in case of rotating.
         6、Detach cable plug when cable is reeled,in case of breaking cable.
    7、220# gear oil was used in the reduction gearbox, change gear oil in April and October per year.
     
    Ⅹ、Ordering notice
    1、Consumer should declare type of drilling machine, diameter and length of matching cable belt conveyor when ordering.
    2、Consumer should declare position of gear, power, speed of rotated gear if have ad hoc request.
    3、Several colors offered below when ordering.
          Content  
     
     
                           Colour
    Sequence
    Number                    
    Mainframe
    Roller
    Chain block
    1
    Eggshell cyan
    Black
    Red
    2
    Nacarat
    Black
    Red
    3
    Blue
    Black
    Yellow
    Explaination:If consumer do not have any other declaration when ordering, we will match colors according to sequence number 1, and also can declare if want to have distinctive color.
    Add to Favorites| Home |Contact
    All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
    Tel:15810047588 Fax:0317---2558811
    Technical Support:Hao Lian Wang Luo
    主站蜘蛛池模板: 在线播放免费播放av片| 美女被到爽羞羞漫画| 护士的护士服被扒了下来小说| 亚洲精品视频在线免费| 老师的兔子好多软水在线看| 国产精品视频区| 中文字幕精品久久久久人妻| 欧美日韩一区二区三区视视频| 国产69精品久久久久妇女| 88aa四虎影成人精品| 天天碰天天摸天天操| 久久午夜福利电影| 欧美91精品久久久久网免费| 免费无码国产V片在线观看 | 极品色天使在线婷婷天堂亚洲| 亚洲欧洲校园自拍都市| 狠狠色婷婷久久一区二区| 免费能直接在线观看黄的视频免费欧洲毛片**老妇女 | 国产成人久久精品一区二区三区| japanmilkhdxxxxxmature| 日本性视频网站| 亚洲欧美中文字幕| 爱情岛论坛亚洲永久入口口| 国产一级视频免费| 香蕉视频亚洲一级| 国产成人一区二区三区精品久久| 欧美成人看片一区二区三区| 好好的日视频www| 三个馊子伦着玩小说冫夏妙晴| 最近韩国电影高清免费观看中文| 亚洲图片小说区| 欧美牲交a欧美牲交aⅴ久久| 亚洲精品国产第1页| 狠狠综合久久久久尤物丿| 做床爱无遮挡免费视频91极品蜜桃臀在线播放 | 欧美日韩一区二区三区自拍| 亚洲熟妇久久精品| 欧美最猛性xxxxx免费| 亚洲欧洲精品成人久久曰| 欧美精品videossex欧美性| 亚洲欧美成人一区二区在线电影|